Writing tips and writing guidelines for students,case study samples, admission essay examples, book reviews, paper writing tips, college essays, research proposal samples
Tuesday, February 26, 2019
Sap Bw Parallel Data Load
Scenario You contribute an jester BW transcription with several (application) servers. You would kindred to distribute the work blame of the data loads and other data w behouse management activities in a way that fits your needs best. This could mean that you would kindred to have all processes distributed across all available servers or that you would wish well to have one dedicated server for these processes. 2 Introduction deplete uses the terms instance and application server synonymously. In order to distract misunderstandings we use the term instance for an conk out instance (application server) in this document.For a physical machine we use the term server. Some of the settings described in this document are done on an instance level, some on a server level. If you dont have several instances (of the selfsame(prenominal) SAP system) on one server you dont have to draw this distinction between instance and server when reading this document. thither are a host of funct ions and settings in the area of load reconciliation provided by the basis system (Web Application Server). However, these have been designed principally for SAPs ERP system.Customizing these features for optimum use with SAP BW requires further considerations. The challenges presented with data load processing originate from the fact that many jolly long running processes can be started almost simultanesouly. The standard SAP load equilibrize approach takes the quality of the instances into consideration when distributing the load. This quality is evaluated in regular intervals (five minutes by default). Within one interval a lot of fit processes may be started on the best instance, utilise a lot of work processes while the other instances are idle.An optimal distribution of BW OLAP workload or data load resource consumption cannot readily be achieved with this standard method. Without suitable planning, and under thick workload (peak) conditions, the risks can increase th at hardware becomes a bottleneck a limited number of servers can become saturated with processes consuming resources, and slaying (and stability) can potentially suffer significantly. A successful load fit approach optimally utilizes the hardware resources that have been allocated to the BW system.Note that this discussion assumes that an adequate sizing has been performed to properly size the SAP BW system (see SAP Service Marketplace alias quicksizer for more information). This document describes load balancing approaches for typical SAP BW activities. Commonly these activities process large amounts of data. information (within one process) is split into packages and can thus be processed in parallel on one or across several servers or instances. On the other hand, several processes can run in parallel on one or on several servers or instances.This center that we can have parallel processing (and consequently achieve load balancing) both within one process and across processes . In our examples we go forth use a system called XXX as SAP BW system and a system called YYY as an SAP source system of XXX. During data load processing, data is extracted from the source system and sent to the physical object SAP BW system. Other load processes involve the SAP BW system as source system, as well as the identify system (for example, DataMarts, activation of data in ODS objects). The instances and servers on XXX are as follows, the server ab1234 being the database server
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.